Prior image  Thumbnail images  Next image

 Internal link

In this photo, taken before the previous shot, number 89 rests beside the coaling ramp with a leaking throttle. The dome cover has already been removed and lies beside the cab. The front-end loader will next be used to lift the heavy steel plate off the steam dome for access to the throttle.