Internal link  Prior photo  Thumbnail photos  Next photo

The public roadway swings to the west crossing above the SBB mainline and beneath a conveyor assembly. One would assume this was for the transport of aggregate used in making cement. Tunnel construction would require tremendous volumes of cement production and transport.