Prior photo  Thumbnail photos  Next photo
As the car departs Aemsigen upgrade it passes over the transfer table type switch at the upper end of the two track passing siding. One wonders how this table would function during the winter months. The railway operates from mid-May to 22 Nov 2015 this year so the table probably wouldn't be worked under extreme temperature or snow conditions.
 Internal link
 Image